News Bridge to Temple Mount reopened amid safety concerns Facebook Twitter Email SMS WhatsApp Share By J. Correspondent | December 16, 2011 The Mughrabi Bridge, which allows pedestrians to walk to the Temple Mount, was reopened 48 hours after it was closed due to safety concerns. The bridge was reopened Dec. 14, with a fire truck stationed nearby as a safety precaution. The Jerusalem city engineer last week threatened to order the immediate closure of the bridge, calling it a fire hazard that is in danger of collapsing. If the bridge does catch fire, it could quickly spread to the Temple Mount, the municipality has warned. The municipality has called on the government to build a “permanent and safe walkway in place of the old one.” A day earlier, Prime Minister Benjamin Netanyahu’s inner Cabinet decided to delay razing the bridge and to renovate instead. On Dec. 12, Jewish activists seized several buildings near the border with Jordan to protest its interference in Temple Mount affairs. Israel and Jordan have been involved in talks to replace the temporary wooden bridge, which was erected in 2004 to replace a damaged stone walkway. Jordan has called on Israel to refrain from destroying the bridge, saying it will change the character of the holy site. Long resented by Muslims, the bridge links the Western Wall to the Temple Mount and had allowed tourists to visit the latter’s Al Aksa and Dome of the Rock mosques. The structure was to have been demolished last month to make way for a new, permanent walkway, but Netanyahu postponed the project in a move widely seen as designed to avoid stirring anti-Israel passions in Arab states rocked by political turmoil. — jta J. Correspondent Also On J. U.S. Chaotic response to Israel's turmoil reveals dilemma for Jewish orgs Bay Area Israeli expats in Bay Area protest latest moves by Netanyahu Passover AI rushes in, but the best new haggadahs are still human-made Recipe Help! I need a main course and a tasty Pesach dessert Subscribe to our Newsletter Enter Email Sign Up